Seite 1 von 1

No checkpoint for some ecm WU's?

Verfasst: 06.07.2018 22:01
von Bas
When I stopped boinc this morning, I was crunching P1 ecm WU's, and some of them were about 1 hour away from the estimated completion time of 7 hours. But when I started boinc an hour ago, all of them started from 0:00!

This is one of those WU's:
https://www.rechenkraft.net/yoyo//worku ... d=39021679

Are there jobs without checkpoints? Did I waste many hours by stopping boinc?

Re: No checkpoint for some ecm WU's?

Verfasst: 07.07.2018 08:38
von yoyo
evo and ecm P1/P2 workunits do not have checkpoints.

Re: No checkpoint for some ecm WU's?

Verfasst: 07.07.2018 12:14
von Bas
Thousands of hours will have been wasted then. What a shame, for both the project and the volunteers.

Is there a way to filter out the P1 en P2 jobs from the other ecm jobs in app_config.xml?