Long runtime ECM WU with short deadlines
Re: Long runtime ECM WU with short deadlines
As I wrote already above, I've got already a lot results of such workunits which runs between 30 and 70 hours.
Re: Long runtime ECM WU with short deadlines
It's not looking hopeful for the first five of these. Three days plus elapsed, five days estimated to go, the 2nd January is the deadline. Beyond is probably correct on this one. I will keep watching but expect these five at least to run out of time.
Oops.
Dunckx
Oops.
Dunckx
- Dateianhänge
-
- One day deadline left for the first five WU, three days plus elapsed so far.
- 8x as T3e25 WU 5 days to run.jpg (83.86 KiB) 5515 mal betrachtet
Re: Long runtime ECM WU with short deadlines
In the returned results I see a mximum runtime of 92 hours.
Will be interresting how long you need.
Will be interresting how long you need.
Re: Long runtime ECM WU with short deadlines
The first 7 of your workunits finished with 81 hours runtime.
They will be converted into a P2 and this second phase is done as additional workunit on a different computer but consuming 10 GB RAM.
They will be converted into a P2 and this second phase is done as additional workunit on a different computer but consuming 10 GB RAM.
Re: Long runtime ECM WU with short deadlines
Excellent news! I thought these were a lost cause, but they must have finished overnight as they were done when I took a look earlier today. Nice one Yoyo.yoyo hat geschrieben:The first 7 of your workunits finished with 81 hours runtime.
They will be converted into a P2 and this second phase is done as additional workunit on a different computer but consuming 10 GB RAM.
I see I have also picked up a 49 digit factor along the way.
Dunckx
Re: Long runtime ECM WU with short deadlines
One of the two I was working on has completed past the deadline at something like 143 hours:
http://www.rechenkraft.net/yoyo/workuni ... d=29249666
The other is still going,showing 18% completion at 144 hours.
http://www.rechenkraft.net/yoyo/workuni ... d=29249666
The other is still going,showing 18% completion at 144 hours.
Re: Long runtime ECM WU with short deadlines
Strange that they need so long.
I increase the credits and double the deadline for new created P1 workunits.
I increase the credits and double the deadline for new created P1 workunits.
Re: Long runtime ECM WU with short deadlines
The other one completed successfully too,I guess the progress bar is just broken on them.
http://www.rechenkraft.net/yoyo/workuni ... d=29249452
That's a lot of maths.
As long as these have checkpoints and a better deadline I have no issue with that.
http://www.rechenkraft.net/yoyo/workuni ... d=29249452
That's a lot of maths.
As long as these have checkpoints and a better deadline I have no issue with that.